High-Rise Walls – Pressure Equalisation and Drained Joints (1982)

As buildings grew taller and façades more complex, the challenge of keeping walls watertight demanded more than simple sealants. “High-Rise Walls: Pressure Equalisation and Drained Joints” by N.G. Brown (1982) explores the evolution of jointing systems that balance performance, durability, and maintenance in modern construction.

The report explains how wind-driven rain, air pressure, and capillary action create water ingress risks — and how pressure-equalised drained joints counter these forces by introducing air seals, drainage cavities, and controlled ventilation paths. It also compares sealant types, from traditional mastics to emerging silicone and polyurethane systems, assessing their long-term resilience.

Brown’s research includes laboratory testing with the CSIRO’s SIROMET rig, evaluating real façade performance under simulated wind and rain. His findings underscored the importance of correct joint detailing, continuous air barriers, and accessible drainage paths — principles that continue to underpin modern façade engineering.

The study remains a cornerstone for architects, engineers, and builders aiming to design durable, low-maintenance, and truly weathertight high-rise envelopes.

Want to dig deeper?
Read the full High-Rise Walls – Pressure Equalisation and Drained Joints paper [here].