Drained Joints – BRANZ Case Studies (1991)

Water leakage and joint failures in wall systems often stem from small detailing oversights that compound under real-world conditions. “Drained Joints – Case Studies” by BRANZ (1991) takes a close look at how drained joint designs perform in practice — through a series of real building investigations, performance reviews, and lessons learned.

The report analyses a range of facade and cladding systems where drained joints were used to manage water ingress. Each case study explores the causes of success or failure, focusing on how design intent, workmanship, maintenance, and system interfaces contribute to weathertightness outcomes.

Key findings emphasise the importance of properly detailed cavities, pressure moderation, and effective drainage paths to ensure long-term durability. These insights remain highly relevant to today’s designers, builders, and façade engineers working with complex cladding systems.

By revisiting these foundational studies, the construction industry can continue to refine how drained joint principles are applied — reducing moisture risk and improving building performance.

Want to dig deeper?
Read the full BRANZ Drained Joints – Case Studies document [here].